Project Object of automation /Equipment |
---|
Pregolskaya PP Supply of IС Diode SOIB |
Pregolskaya PP Bringing the OKII to the "reference" state. Exam. PTK Automated control System |
Pregolskaya PP Supply of IС Diode SOIB |
Pregolskaya PP SOIB+ (IT Infrastructure Preparation) SOIB |
Pregolskaya PP Bringing it to the reference state. PTK Automated control System |
Urengojskaya PP Modernization of the SPPA-T3000 CCGT-450 Power unit No. 1 /SPPA-T3000 |
Urengojskaya PP Prototyping of environmental protection measures Urengojskaya PP /SPPA-T3000 |
Urengojskaya PP PTC Automated control System service 2021 Power unit No.1 /SIPROTEC, S7, SPPA-T3000 |
Urengojskaya PP PTC Automated control System service 2022 Power unit No.1 /SIPROTEC, S7, SPPA-T3000 |
Urengojskaya PP PTC Automated control System service 2023 Power unit No.1 /SPPA-T3000, S7, SIPROTEC |
Urengojskaya PP PTC Automated control System service 2024 Power unit No.1 /SPPA-T3000, S7, SIPROTEC |
Urengojskaya PP Supply of IR diodes PTK Automated control System /SPPA-T3000 |
Urengojskaya PP PSU-450 and VPU simulator service 2023-2025 PSU simulator-450 MW and VPU /SPPA-T3000 |
Urengojskaya PP Bringing the OKII to the "reference" state. Exam Urengojskaya PP /SPPA-T3000 |
Urengoyskaya GRES Bringing it to the reference state Power unit No. 1 /SPPA-T3000 |
Urengoyskaya GRES Integration of additional signals into the PTK automated control system ETO-1 PTK AUTOMATED CONTROL SYSTEM ETO-1 /SPPA-T3000 |
Cherepetskaya GRES All-time adjustment of regulators Power unit No. 8, Power unit No. 9 /MetsoDNA |
Cherepetskaya GRES Reconstruction of the electric supply CH, supply of UPS PTK ACS ETO /MetsoDNA |
Cherepetskaya GRES Service support of PTK Automated control system bl. 8, 9 in 2020-2021 Power unit No. 8, Power unit No. 9 /MetsoDNA |
Cherepetskaya GRES Modernization of the automated control system CCA bl. 8,9 (PIR) Power unit No. 8, Power unit No. 9 /MetsoDNA |
Object: | |
Sevices: |