Project
Object of automation /Equipment |
Project |
Object of automation / Equipment |
Services |
Berezovskaya PP Modernization of SCADA, replacement with SPPA-T3000 I&C systems of unit №2
|
Unit №2 /SPPA-T3000
|
Berezovskaya PP Modernization of SCADA, replacement with SPPA-T3000 I&C systems of unit №2
Unit №2 /SPPA-T3000
|
Engineering, commissioning |
Berezovskaya PP Replacement of excitation system of unit №2
|
Unit №2 /SPPA-T3000
|
Berezovskaya PP Replacement of excitation system of unit №2
Unit №2 /SPPA-T3000
|
Engineering, delivery, SPV of erection, commissioning |
Berezovskaya PP Technical workstation delivery
|
Unit №2 /SPPA-T3000
|
Berezovskaya PP Technical workstation delivery
Unit №2 /SPPA-T3000
|
Engineering, delivery, erection, commissioning |
Omskaya PP-3 Unit №10 turbine control system service
|
Steam turbine /SPPA-T3000
|
Omskaya PP-3 Unit №10 turbine control system service
Steam turbine /SPPA-T3000
|
Service maintenance |
Niznevartovskaya PP Unit №3 gas compressor station service
|
Unit №3 gas compressor station /Simatic
|
Niznevartovskaya PP Unit №3 gas compressor station service
Unit №3 gas compressor station /Simatic
|
Service maintenance |
Niznevartovskaya PP Service of unit №3 I&C systems
|
CCPP 400 MW /SPPA-T3000
|
Niznevartovskaya PP Service of unit №3 I&C systems
CCPP 400 MW /SPPA-T3000
|
Service maintenance |
Mayakovskaya PP/Talahovskaya PP Diesel power plant I&C
|
Gas turbine PP /Simatic PCS7
|
Mayakovskaya PP/Talahovskaya PP Diesel power plant I&C
Gas turbine PP /Simatic PCS7
|
Engineering, delivery, SPV of erection, commissioning, training |
Urengojskaya PP I&C systems service
|
CCPP 450 MW /SPPA-T3000
|
Urengojskaya PP I&C systems service
CCPP 450 MW /SPPA-T3000
|
Service maintenance |
JSC ”GSR PP”, Kolpino I&C systems service
|
CCPP /SPPA-T3000
|
JSC ”GSR PP”, Kolpino I&C systems service
CCPP /SPPA-T3000
|
Service maintenance |
Pregolskaya PP I&C systems of units №1,2,3,4 (4 x CCPP110 MW)
|
4x CCPP 110 MW (gas fired) /SPPA-T3000
|
Pregolskaya PP I&C systems of units №1,2,3,4 (4 x CCPP110 MW)
4x CCPP 110 MW (gas fired) /SPPA-T3000
|
Engineering, delivery, SPV of erection, commissioning, training |
Primorskaya PP I&C systems of units №1,2,3 (3x65 MW)
|
3x Unit 65MW (coal), ACS Cooling Towers /Simatic PCS7
|
Primorskaya PP I&C systems of units №1,2,3 (3x65 MW)
3x Unit 65MW (coal), ACS Cooling Towers /Simatic PCS7
|
Engineering, delivery, SPV of erection, commissioning, training |
Permskaya PP
Main control room retrofitting
|
Switchyard 220/500 /SPPA-T3000
|
Permskaya PP
Main control room retrofitting
Switchyard 220/500 /SPPA-T3000
|
Engineering, commissioning, training |
Permskaya PP Unit №5 I&C
|
Unit №3 /SPPA-T3000
|
Permskaya PP Unit №5 I&C
Unit №3 /SPPA-T3000
|
Engineering, commissioning, training |
Omskaya PP-3 CCPP 90 MW
|
CCPP 90 MW /SPPA-T3000
|
Omskaya PP-3 CCPP 90 MW
CCPP 90 MW /SPPA-T3000
|
Service maintenance |
Permskaya PP Modernization of the PTK "Station"
|
PTK "Station"
|
Permskaya PP Modernization of the PTK "Station"
PTK "Station"
|
Design, manufacture, commissioning, training of the customer's personnel |
Permskaya PP Prototyping of environmental protection measures
|
Permskaya PP
|
Permskaya PP Prototyping of environmental protection measures
Permskaya PP
|
Inspection, analysis, development of specifications of the SrZI, design |
Permskaya PP Replacement and commissioning of network switches
|
GT, PT of the Power Unit of station No. 4 /SPPA-T3000
|
Permskaya PP Replacement and commissioning of network switches
GT, PT of the Power Unit of station No. 4 /SPPA-T3000
|
Installation, configuration |
Permskaya PP Modernization of the PTK automated control system
|
Power unit No. 1 /INCONT-T
|
Permskaya PP Modernization of the PTK automated control system
Power unit No. 1 /INCONT-T
|
Проектирование, изготовление, монтаж, наладка, обучение персонала заказчика |
Permskaya PP Analysis of the quality of PGU-800 launches
|
Power unit No. 4
|
Permskaya PP Analysis of the quality of PGU-800 launches
Power unit No. 4
|
Research, analysis, development, creation of a hardware and software system |
Permskaya PP Creation of an information security system
|
Power units No. 1-4, THESE ARE auxiliary EC automation systems, auxiliary GRES systems, SARCHM, CCA, HVO, OPK, PPG /INCONT-T, SPPA-T3000, TPTS
|
Permskaya PP Creation of an information security system
Power units No. 1-4, THESE ARE auxiliary EC automation systems, auxiliary GRES systems, SARCHM, CCA, HVO, OPK, PPG /INCONT-T, SPPA-T3000, TPTS
|
Design, installation, commissioning, testing |