The complete cycle
of automation
Our services is turnkey I&C solutions
Installed capacity is 33 000 MW
Our services is turnkey I&C solutions
Installed capacity is 33 000 MW

Projects

Print
Total count of projects: 155
Equipment
Finded: 155 projects
Project
Object of automation /Equipment
Project Object of automation /
Equipment
Services
Urengojskaya PP
PTC Automated control System service 2023
View on the map
Power unit No.1 /SPPA-T3000, S7, SIPROTEC
Urengojskaya PP
PTC Automated control System service 2023
Power unit No.1 /SPPA-T3000, S7, SIPROTEC
Service maintenance
Urengojskaya PP
PTC Automated control System service 2024
View on the map
Power unit No.1 /SPPA-T3000, S7, SIPROTEC
Urengojskaya PP
PTC Automated control System service 2024
Power unit No.1 /SPPA-T3000, S7, SIPROTEC
Service maintenance
Urengojskaya PP
Supply of IR diodes
View on the map
PTK Automated control System /SPPA-T3000
Urengojskaya PP
Supply of IR diodes
PTK Automated control System /SPPA-T3000
Equipment supply
Urengojskaya PP
PSU-450 and VPU simulator service 2023-2025
View on the map
PSU simulator-450 MW and VPU /SPPA-T3000
Urengojskaya PP
PSU-450 and VPU simulator service 2023-2025
PSU simulator-450 MW and VPU /SPPA-T3000
After-sales service
Urengojskaya PP
Bringing the OKII to the "reference" state. Exam
View on the map
Urengojskaya PP /SPPA-T3000
Urengojskaya PP
Bringing the OKII to the "reference" state. Exam
Urengojskaya PP /SPPA-T3000
Inspection, analysis, design.
Urengoyskaya GRES
Bringing it to the reference state
View on the map
Power unit No. 1 /SPPA-T3000
Urengoyskaya GRES
Bringing it to the reference state
Power unit No. 1 /SPPA-T3000
SOIB design, delivery, commissioning.
Urengoyskaya GRES
Integration of additional signals into the PTK automated control system ETO-1
View on the map
PTK AUTOMATED CONTROL SYSTEM ETO-1 /SPPA-T3000
Urengoyskaya GRES
Integration of additional signals into the PTK automated control system ETO-1
PTK AUTOMATED CONTROL SYSTEM ETO-1 /SPPA-T3000
Design, modernization, commissioning.
Cherepetskaya GRES
All-time adjustment of regulators
View on the map
Power unit No. 8, Power unit No. 9 /MetsoDNA
Cherepetskaya GRES
All-time adjustment of regulators
Power unit No. 8, Power unit No. 9 /MetsoDNA
Commissioning, testing
Cherepetskaya GRES
Reconstruction of the electric supply CH, supply of UPS
View on the map
PTK ACS ETO /MetsoDNA
Cherepetskaya GRES
Reconstruction of the electric supply CH, supply of UPS
PTK ACS ETO /MetsoDNA
Design, documentation and software development, installation, commissioning, testing, staff training
Cherepetskaya GRES
Service support of PTK Automated control system bl. 8, 9 in 2020-2021
View on the map
Power unit No. 8, Power unit No. 9 /MetsoDNA
Cherepetskaya GRES
Service support of PTK Automated control system bl. 8, 9 in 2020-2021
Power unit No. 8, Power unit No. 9 /MetsoDNA
Service support
Cherepetskaya GRES
Modernization of the automated control system CCA bl. 8,9 (PIR)
View on the map
Power unit No. 8, Power unit No. 9 /MetsoDNA
Cherepetskaya GRES
Modernization of the automated control system CCA bl. 8,9 (PIR)
Power unit No. 8, Power unit No. 9 /MetsoDNA
Design, preparation of documentation
Cherepetskaya GRES
PTK ACS TVS
View on the map
PTK ACS TVS /INCONT-R
Cherepetskaya GRES
PTK ACS TVS
PTK ACS TVS /INCONT-R
Supply, installation, commissioning, staff training
Cherepetskaya GRES
Prototyping of environmental protection measures
View on the map
Cherepetskaya GRES
Cherepetskaya GRES
Prototyping of environmental protection measures
Cherepetskaya GRES
Inspection, analysis, development of specifications of the SrZI, design
Cherepetskaya GRES
Setting up the offline mode
View on the map
Power unit No. 8, Power unit No. 9 /MetsoDNA
Cherepetskaya GRES
Setting up the offline mode
Power unit No. 8, Power unit No. 9 /MetsoDNA
Inspection, adjustment
Cherepetskaya GRES
Re-equipment of the PTK Automated control system (stage 2). Design work
View on the map
OSO (PZSHU, KRUE, NPPV) /INCONT-R
Cherepetskaya GRES
Re-equipment of the PTK Automated control system (stage 2). Design work
OSO (PZSHU, KRUE, NPPV) /INCONT-R
Design, preparation of documentation
Cherepetskaya GRES
Replacement of the ECP on Blocks 8,9
View on the map
Power unit No. 8, Power unit No. 9 /MetsoDNA
Cherepetskaya GRES
Replacement of the ECP on Blocks 8,9
Power unit No. 8, Power unit No. 9 /MetsoDNA
Design, installation, commissioning
Cherepetskaya GRES
Maintenance of equipment of ECSR Blocks 8,9
View on the map
Power unit No. 8, Power unit No. 9 /Simatic PCS7, S7
Cherepetskaya GRES
Maintenance of equipment of ECSR Blocks 8,9
Power unit No. 8, Power unit No. 9 /Simatic PCS7, S7
After-sales service
Cherepetskaya GRES
OSO reconstruction Stage 1 (implementation)
View on the map
Power Unit No.8, Power Unit No. 9, OSO
Cherepetskaya GRES
OSO reconstruction Stage 1 (implementation)
Power Unit No.8, Power Unit No. 9, OSO
Installation, commissioning, testing
Cherepetskaya GRES
Start-up and commissioning of LSU TVS
View on the map
Power unit No. 8, Power unit No. 9
Cherepetskaya GRES
Start-up and commissioning of LSU TVS
Power unit No. 8, Power unit No. 9
Setting up
Черепетская ГРЭС
LSU MVS boilers 12,13
View on the map
Boiler mills 12,13
Черепетская ГРЭС
LSU MVS boilers 12,13
Boiler mills 12,13
Designing
Object:
Sevices: