Project
Object of automation /Equipment |
Project |
Object of automation / Equipment |
Services |
Pregolskaya PP I&C systems of units №1,2,3,4 (4 x CCPP110 MW)
|
4x CCPP 110 MW (gas fired) /SPPA-T3000
|
Pregolskaya PP I&C systems of units №1,2,3,4 (4 x CCPP110 MW)
4x CCPP 110 MW (gas fired) /SPPA-T3000
|
Engineering, delivery, SPV of erection, commissioning, training |
Primorskaya PP I&C systems of units №1,2,3 (3x65 MW)
|
3x Unit 65MW (coal), ACS Cooling Towers /Simatic PCS7
|
Primorskaya PP I&C systems of units №1,2,3 (3x65 MW)
3x Unit 65MW (coal), ACS Cooling Towers /Simatic PCS7
|
Engineering, delivery, SPV of erection, commissioning, training |
Permskaya PP
Main control room retrofitting
|
Switchyard 220/500 /SPPA-T3000
|
Permskaya PP
Main control room retrofitting
Switchyard 220/500 /SPPA-T3000
|
Engineering, commissioning, training |
Permskaya PP Unit №5 I&C
|
Unit №3 /SPPA-T3000
|
Permskaya PP Unit №5 I&C
Unit №3 /SPPA-T3000
|
Engineering, commissioning, training |
Omskaya PP-3 CCPP 90 MW
|
CCPP 90 MW /SPPA-T3000
|
Omskaya PP-3 CCPP 90 MW
CCPP 90 MW /SPPA-T3000
|
Service maintenance |
Permskaya PP Modernization of the PTK "Station"
|
PTK "Station"
|
Permskaya PP Modernization of the PTK "Station"
PTK "Station"
|
Design, manufacture, commissioning, training of the customer's personnel |
Permskaya PP Prototyping of environmental protection measures
|
Permskaya PP
|
Permskaya PP Prototyping of environmental protection measures
Permskaya PP
|
Inspection, analysis, development of specifications of the SrZI, design |
Permskaya PP Replacement and commissioning of network switches
|
GT, PT of the Power Unit of station No. 4 /SPPA-T3000
|
Permskaya PP Replacement and commissioning of network switches
GT, PT of the Power Unit of station No. 4 /SPPA-T3000
|
Installation, configuration |
Permskaya PP Modernization of the PTK automated control system
|
Power unit No. 1 /INCONT-T
|
Permskaya PP Modernization of the PTK automated control system
Power unit No. 1 /INCONT-T
|
Проектирование, изготовление, монтаж, наладка, обучение персонала заказчика |
Permskaya PP Analysis of the quality of PGU-800 launches
|
Power unit No. 4
|
Permskaya PP Analysis of the quality of PGU-800 launches
Power unit No. 4
|
Research, analysis, development, creation of a hardware and software system |
Permskaya PP Creation of an information security system
|
Power units No. 1-4, THESE ARE auxiliary EC automation systems, auxiliary GRES systems, SARCHM, CCA, HVO, OPK, PPG /INCONT-T, SPPA-T3000, TPTS
|
Permskaya PP Creation of an information security system
Power units No. 1-4, THESE ARE auxiliary EC automation systems, auxiliary GRES systems, SARCHM, CCA, HVO, OPK, PPG /INCONT-T, SPPA-T3000, TPTS
|
Design, installation, commissioning, testing |
Permskaya PP IR delivery.Redundant Execution Gateway
|
Permskaya PP
|
Permskaya PP IR delivery.Redundant Execution Gateway
Permskaya PP
|
Delivery, configuration |
Permskaya PP Impotence of HW and BY Contact
|
PTK "Station"
|
Permskaya PP Impotence of HW and BY Contact
PTK "Station"
|
Design, manufacture, installation, commissioning |
Kostromskaya PP Supply of SSPRTI equipment
|
A system for collecting and transmitting technological information
|
Kostromskaya PP Supply of SSPRTI equipment
A system for collecting and transmitting technological information
|
Engineering, delivery, erection and commissioning, training |
Kostromskaya PP Training of PTC "INCONT"
|
PTC "INCONT" /INCONT-T
|
Kostromskaya PP Training of PTC "INCONT"
PTC "INCONT" /INCONT-T
|
Training, consulting |
Kostromskaya PP Prototyping of environmental protection measures
|
Kostromskaya PP /INCONT-T
|
Kostromskaya PP Prototyping of environmental protection measures
Kostromskaya PP /INCONT-T
|
Inspection, analysis, development of specifications of the SrZI, design |
Kostromskaya PP PTK Automated control System service
|
Power unit No. 1 /INCONT-T
|
Kostromskaya PP PTK Automated control System service
Power unit No. 1 /INCONT-T
|
Service maintenance |
Kostromskaya PP Modernization of the PTK "Kvint"
|
Power unit No. 8
|
Kostromskaya PP Modernization of the PTK "Kvint"
Power unit No. 8
|
Design, installation, commissioning |
Kostromskaya PP Modernization of the PTK "Kvint"
|
Power unit No. 4
|
Kostromskaya PP Modernization of the PTK "Kvint"
Power unit No. 4
|
Design, installation, commissioning |
Kostromskaya PP Supply of diodes
|
PTK Automated control System
|
Kostromskaya PP Supply of diodes
PTK Automated control System
|
Supply of a software and hardware complex for unidirectional transmission of technological information IR.DIODE |